Passdown request

Tower 333

Request property management approval for building access, freight, loading dock and work in Tower 333. You'll get an email confirmation with a link to track your request. Sign in to save templates and see your history (optional).

Building information

Loading dock
14 ft
Address
333 108th Ave NE, Bellevue WA 98004
Questions
Property Management · 425.333.1610

Requester

Subcontractors

Location & time

Overnight work: an end time earlier than the start time (e.g. 8:00 PM – 8:00 AM) ends the next day. For several nights, set the end date to the morning the last night ends.

Passdowns need two business days' notice: the earliest standard start date is Tuesday, November 03.

Scope of work

Drop files here or choose them. This box highlights while you drag.

Word, PDF, Excel/CSV or JPG/PNG/HEIC images · up to 25 MB each, 10 files. Only property management and building engineering can see them.

Checklist

Open each section that applies and turn on what you need. A section turns green and gets a check when something in it is on. Each explains the option for Tower 333.

AccessWhere are you going and what can we help you with?
Is an escort required?

Pick 30-minute slots inside your passdown dates and times. 6 trucks per slot at this building; striped slots are full. The dock is open 24/7.

Set the start and end date and time under Location & time to see the dock slots for your passdown.

Fire, Life Safety SystemsSystem Bypass, Sprinkler, Hot Work
Fire Alarm System

Engineering issues the permit on site; it prints as a two-copy PDF (security office + work area).

Pre-fill the permit now (optional)

Engineering issues the permit on site; it prints as a two-copy PDF (security office + work area).

Pre-fill the permit now (optional)
HVAC + LightingSchedule modifications or temporary override requests.
Same as HVAC?
Construction / TI RelatedNoise, Core Drilling, Roto-Hammer, Dust, Odor

⚠ Engineering will look at a suggested fire alarm bypass for the dusty area.

General comments

Emergency / expedited

Standard requests need two business days' notice. If your work starts before Tuesday, November 03, tick this box and tell us why. Expedited requests are reviewed first, but approval isn't guaranteed.